Slovenia: NPP Krsko exceeds...

In September 2025, the Krsko nuclear power plant, jointly owned by Slovenia and...

Romania: Electrica completes 27...

Romanian electricity distributor and supplier Electrica has completed the construction of the Satu...

Romania: NEPI Rockcastle launches...

NEPI Rockcastle, the largest owner and operator of shopping centers in Central and...

Bulgaria: Bulgargaz secures LNG...

Bulgaria’s state-owned natural gas supplier Bulgargaz has completed a tender to meet part...
Supported byClarion Energy
HomeSEE Energy NewsSerbia: Work on...

Serbia: Work on gas interconnection with Bulgaria completed

Serbian Mining and Energy Minister Dubravka Djedovic Handanovic announced on December 3 that all the work on the interconnector with Bulgaria has been completed and testing should begin this week on a “strategically important” interconnector to carry natural gas between Bulgaria and Serbia.

Djedovic Handanovic said the 109 kilometres of new pipeline with a transmission station in Trupale would more safely provide a stable supply of gas to Serbia from different sources, “especially Azerbaijan.”

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Serbia as a re-export hub: Europe’s gateway to third markets

In an increasingly globalized supply chain environment, Serbia is emerging not only as an engineering and manufacturing base but as a strategic re-export hub for EU companies aiming to access third markets. By combining favorable trade agreements, geographic positioning, and a...

From Čačak to Europe: Nearshoring shared business services with regional talent and real connectivity

Čačak sits in the heart of Serbia with an asset mix that plays perfectly to near-sourcing: a deep regional talent catchment, motorways that cut transit times to major hubs, and operating costs that let you scale shared business services...

The new currency of trust: Where technical risk meets financial consequence

In modern infrastructure, oversight isn’t a paperwork ritual—it’s a translation exercise. Design choices, test results, and schedule slips must be converted into hard numbers a credit committee can act on. That alignment of technical risk with financial consequence has...
Supported byVirtu Energy
error: Content is protected !!