Transelectrica launches major projects...

Romanian electricity transmission system operator Transelectrica has launched two major infrastructure projects to...

Romania launches third CfD...

The Romanian Ministry of Energy, in cooperation with Transelectrica, the operator of the...

Montenegro: EPA clears two...

Montenegro’s Environmental Protection Agency (EPA) has decided that Unipan Green, a local company,...

Slovenia: Šoštanj thermal power...

At the end of September, the Šoštanj thermal power plant began an extensive...
Supported byClarion Energy
HomeSEE Energy NewsGreece: PPC keepes...

Greece: PPC keepes October electricity tariff unchanged

Power utility PPC, the Greek retail electricity market’s dominant player, has announced unchanged nominal tariffs for October.

PPC’s October tariff, for monthly consumption of up to 500 kWh, was left unchanged at 15.5 cents per kWh, as was the supplier’s tariff for consumption levels exceeding this limit, unchanged at 16.7 cents per kWh. The supplier also set a nighttime consumption rate of 11.4 cents per kWh.

Local electricity market rules require suppliers to announce nominal tariffs – not including subsidies – for each forthcoming month by the 20th of every previous month, Energypress reports.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Transelectrica launches major projects to strengthen Romania–Moldova power interconnection

Romanian electricity transmission system operator Transelectrica has launched two major infrastructure projects to strengthen the national grid and enhance interconnection with neighboring Moldova. The initiatives include the 400 kV Gadalin-Suceava overhead transmission line and the 400 kV Suceava-Balti interconnection...

Romania launches third CfD tender for 290 MW of onshore wind projects

The Romanian Ministry of Energy, in cooperation with Transelectrica, the operator of the Contracts for Difference (CfD) mechanism, has announced the third competitive tender for renewable energy producers under the CfD support scheme. The bidding process will take place...

Montenegro: EPA clears two Unipan Green solar projects without full environmental assessment

Montenegro’s Environmental Protection Agency (EPA) has decided that Unipan Green, a local company, will not need to conduct an environmental impact assessment for two planned solar power projects located south of Podgorica. The first project will have an installed capacity...
Supported byVirtu Energy
error: Content is protected !!