Slovenia: Climate negotiator challenges...

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition...

Romania: Constanța to get...

A new high-efficiency cogeneration plant is under development on the site of the...

Romania: Ministry of Energy...

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering...

Bosnia and Herzegovina: EPBiH...

State-owned power utility EPBiH has opened a tender for the preparation of the...
Supported byClarion Energy
HomeSEE Energy NewsMontenegro: EPCG is...

Montenegro: EPCG is developing a 47 MW solar project in Niksic

Montegrin state-owned power utility EPCG received urban planning and technical conditions for the project of a solar power plant with a maximum power of 47 megawatts in Nikšić. Before that, it issued a document of the same type for a 186 megawatt photovoltaic park to a company founded four months ago, also on the territory of the second largest city in Montenegro.

The Government of Montenegro continues to approve urban planning and technical conditions for large investments in solar power plants. In order for the project to reach that stage, the investor needs to collect the opinions and approvals of a number of regulatory bodies and ministries and network operators. 

EPCG, is the last company to achieve this step. It received the green light for a photovoltaic park of 47 megawatts of nominal or peak power. It is about the maximum capacity at which the panels can produce direct current in total, while the connected power is usually a fifth lower. 

The annual production is estimated at 61.7 gigawatt-hours. The location is on the territory of the municipality of Nikšić, where the company’s headquarters are also located. It is located near Stuba, on the northern shore of Lake Krupac, a few kilometers from the second largest city in the country. Annual production is estimated at 61.7 gigawatt-hours, the document shows. The land is owned by EPCG. 

EPCG previously received urban planning and technical conditions for the project of a small hydroelectric power plant near the Otilovići hydroaccumulation, from which it supplies water to that plant. Among the other news, it should be noted that the representatives of EPCG and the American company UGT Renewables discussed cooperation in the development of the Velje Brdo solar power plant project in Podgorica. They signed an agreement on the joint development of such ventures last year, and this one is now the first to be mentioned in this context.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Slovenia: Climate negotiator challenges legality of Krsko nuclear power plant expansion plan

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition with the Constitutional Court challenging the legality of the national spatial plan procedure for the proposed second unit at the Krsko nuclear power plant. Representing public...

Romania: Constanța to get modern gas-hydrogen cogeneration plant, replacing 1970s infrastructure

A new high-efficiency cogeneration plant is under development on the site of the former CET Palas facility in Constanța, replacing infrastructure dating back to the 1970s. Valued at 120 million euros and largely financed through the National Recovery and...

Romania: Ministry of Energy unveils five-point plan to cut electricity prices by 20–25%

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering electricity prices, with measures expected to take effect next week. Energy Minister Bogdan Ivan stated that the initiative, developed in consultation with producers, distributors, suppliers, and...
Supported byVirtu Energy
error: Content is protected !!