2030–2035 scenario annex: Gas...

Scenario one: High volatility, tight LNG markets In a scenario characterised by global LNG...

What the European gas...

The European natural gas market has moved decisively away from its pre-2020 equilibrium....

Policy without borders: How...

Electricity market coupling is often discussed in technical or commercial terms, but its...

Fragmented convergence: Why Southeast...

For much of the past decade, the dominant assumption shaping policy and market...
Supported byClarion Energy
HomeMiningSerbia: Zijin Mining...

Serbia: Zijin Mining company looks for environmental permit for for the exploitation of copper near Bor

 

The company Serbia Zijin Mining submitted to the Ministry of Environmental Protection at the end of June a request for a decision on the need for an environmental impact assessment of the project to exploit ore from the Čukaru Peki copper and gold deposits (Upper Zone 2).

The copper and gold deposit Čukaru Peki Upper zone Ore bodies 1 and 2 is located near the village of Brestovac near Bor, reports eKapija.

The subject of the request is the underground exploitation of copper ore, with a capacity of 5,000 tons per day, or 1.65 million tons per year.

 

Excavation will be carried out on the basis of the Elaboration on resources and reserves of copper and gold in the Čukaru Peki upper zone deposit (ore bodies 1 and 2), which was prepared last summer by the Institute for Mining and Metallurgy, and according to which in ore body 2 in the upper zone they find balance reserves of 15,585,343 tons of wet ore.

According to the project, it is planned to excavate the deposit up to the level of k-380 meters (m), that is, to a depth of about 7,600 m.

All mining processes will be based on the Main mining project for the exploitation of ore from the Čukaru Peki copper and gold deposit – upper zone, which was also developed by the Institute of Mining and Metallurgy, in 2021.

The document also mentions that the investor plans to deposit copper ore at the existing tailings dump, where it will be elevated to enable the disposal of 1.95 million cubic meters (m3) of ore and 500,000 m3 of tailings.

 

As the reason for this solution, it is stated that the flotation capacity is lower than the mining capacity of the pit, and therefore the copper ore will be deposited at the mentioned landfill until a new flotation plant is built, which will later use the deposited ore, which is planned for 2026.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Scenario-based 2030–2040 supply-chain outlook: electricity, logistics, SEE corridors and Europe’s processing competitiveness

Europe’s pursuit of strategic autonomy in raw materials, electrification metals and industrial processing capacity is entering a decade defined by volatile energy markets, shifting logistics routes, geopolitical fragmentation and competition for midstream value creation. ReSourceEU has marked Europe’s strategic...

Serbia and Azerbaijan sign agreement on energy and mining cooperation

The Governments of Serbia and Azerbaijan have signed a cooperation agreement focused on energy and mining, aiming to strengthen collaboration between the two countries in these sectors. The agreement outlines joint activities to promote cooperation and business relations, based...

Serbia’s strategic advantages in heavy industrial equipment, mining machinery and steel manufacturing for global markets

Serbia is rapidly establishing itself as a key player in the production and export of heavy industrial equipment, mining machinery and steel for global markets. This growth is fueled by the country’s combination of strategic geographic positioning, skilled labor force, competitive costs and...
Supported byVirtu Energy
error: Content is protected !!