Financing wind in Montenegro,...

The landscape of renewable finance in Southeast Europe has undergone a profound transformation....

How Southeast Europe’s grid...

Wind development in Southeast Europe is accelerating at a pace unimaginable only a...

Serbia–Romania–Croatia: The new triangular...

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside...

The bankability gap in...

The transformation of Southeast Europe into a credible wind-investment region has been rapid,...
Supported byClarion Energy
HomeSEE Energy NewsBosnia and Herzegovina,...

Bosnia and Herzegovina, ERS hired advisers for urgent review of production capacities

State-owned power utility ERS will pay some 1.1 million euros to advisors from Serbia for urgent expert review of the state of its production capacities with recommendations for their improvements.

The tender was launched in early January, after the review was asked by the Prime Minister of the Republic of Srpska (RS) Radovan Viskovic and RS Minister of Energy and Mining Petar Djokic. The most favorable offer was submitted by a consortium of institutes from Serbia.

ERS said that the emergency procedure was launched due to reasons of extreme urgency caused by events unforeseeable for the contracting authority, the impossibility of complying with the minimum deadlines established by law for an open, limited or negotiation procedure with publication notifications. The company was tasked with urgently conducting an in-depth analysis of the energy system, primarily related to production facilities in order to determine if the situation is critical and what are the urgent steps that must be taken in order to avoid downtimes.

Namely, the authorities requested an analysis of the situation in five subsidiary companies of ERS – two coal-fired thermal power plants (Ugljevik and Gacko) and three hydropower plants (on Drina, Trebisnjica and Vrbas rivers), which will indicate the differences between the projected and realized electricity production, the current state of equipment and facilities, with the identification and analysis of the occurrence of technological and technical limitations in production, and possible improvements.

Sign up for updates & special reports

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Financing wind in Montenegro, Serbia, Croatia and Romania — why international lenders are returning to Southeast Europe

The landscape of renewable finance in Southeast Europe has undergone a profound transformation. A decade ago, lenders viewed the region with a degree of caution, shaped by fluctuating regulatory frameworks, limited track records, and the perceived fragility of local...

How Southeast Europe’s grid bottlenecks will reshape project valuation, offtake strategy and EPC designs by 2030

Wind development in Southeast Europe is accelerating at a pace unimaginable only a decade ago, yet the region’s grid infrastructure is straining under the weight of its own renewable ambition. Serbia is preparing for multi-gigawatt expansion, Romania is restarting...

Serbia–Romania–Croatia: The new triangular wind corridor — is Southeast Europe becoming Europe’s next Iberia?

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside Europe: strong resource, open land, grid-ready corridors, competitive auctions, and the steady inflow of international capital. Investors seeking scale, yield, and policy clarity migrated naturally towards...
Supported byVirtu Energy
error: Content is protected !!