Slovenia: Climate negotiator challenges...

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition...

Romania: Constanța to get...

A new high-efficiency cogeneration plant is under development on the site of the...

Romania: Ministry of Energy...

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering...

Bosnia and Herzegovina: EPBiH...

State-owned power utility EPBiH has opened a tender for the preparation of the...
Supported byClarion Energy
HomeSEE Energy NewsBosnia and Herzegovina,...

Bosnia and Herzegovina, Gross electricity production in the FBiH in August amounted to 571 GWh

Gross electricity production in the Federation of Bosnia and Herzegovina (FBiH) in August 2022 amounted to 571 GWh, which is by 5.8 % lower compared to August last year, when it amounted to 606 GWh.

Net electricity production amounted to 527 GWh, of which 122 GWh (23.2 %) was produced in hydropower plants, 375 GWh (71.2 %) was produced in thermal power plants, while wind farms produced 30 GWh. In August, electricity imports amounted to 79 GWh, compared to 227 GWh in the same month last year, while electricity exports amounted to 90 GWh, compared to 215 GWh last August.

In the same month, production of brown coal amounted to 451,985 tons, which is 30.8 % more compared to 2021 when the production stood at 345,487 tons. Lignite production in August 2022 amounted to 120,043 tons, while in August 2021 it amounted to 95,855 tons, a 25.2 % increase.

Coke production in August 2022 totaled 64,883 tons, which is 13.5 % less than 75.016 tons produced in August 2021.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Slovenia: Climate negotiator challenges legality of Krsko nuclear power plant expansion plan

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition with the Constitutional Court challenging the legality of the national spatial plan procedure for the proposed second unit at the Krsko nuclear power plant. Representing public...

Romania: Constanța to get modern gas-hydrogen cogeneration plant, replacing 1970s infrastructure

A new high-efficiency cogeneration plant is under development on the site of the former CET Palas facility in Constanța, replacing infrastructure dating back to the 1970s. Valued at 120 million euros and largely financed through the National Recovery and...

Romania: Ministry of Energy unveils five-point plan to cut electricity prices by 20–25%

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering electricity prices, with measures expected to take effect next week. Energy Minister Bogdan Ivan stated that the initiative, developed in consultation with producers, distributors, suppliers, and...
Supported byVirtu Energy
error: Content is protected !!