Romania: GE Vernova secures...

GE Vernova has signed an agreement with Greenvolt International Power to supply wind...

Montenegro launches geological surveys...

Geological surveys for the Krusevo hydropower plant have started, marking the first concrete...

Montenegro: EPCG and France’s...

Montenegro’s state-owned power utility EPCG has signed a cooperation agreement with French renewable...

Croatia enters heating season...

Croatia is entering the new heating season with stable gas supplies, high storage...
Supported byClarion Energy
HomeSEE Energy NewsBulgaria, 33% drop...

Bulgaria, 33% drop in hydropower production in 2022.

Bulgarian hydropower plants have produced 1 million MWh less since the beginning of the year compared to the same period last year. This represents a decrease of 33%, although the total electricity production in the country increased by 20%. At the same time, the demand for electricity in the region is growing, and prices are at a record high.

Given that most hydropower plants in the country are owned by the state power company NEK, the question arises as to why hydropower plants do not operate at higher capacity, missing the opportunity to significantly increase revenues in the current environment.

There are at least two reasons for that – less rainfall and repairs.

NEK is currently not one of the most active players on the Bulgarian energy exchange IBEX, as, according to the Electricity System Operator, hydropower plants have produced 2m MWh since the beginning of this year, compared to 3m MWh a year earlier.

According to IBEX data, NEK has been selling electricity from hydropower plants in recent weeks at prices ranging from 185 to 220 euros per MWh. This means that due to the fall in production, NEK lost about 200 million euros in revenue.

NEK owns large hydropower plants such as RHE Chair, HPP Orpheus and Momina Klisura. However, some of them, such as HPP Belmeken and Caira, are not operating at full capacity, ie are completely out of order, which inevitably affects the final balance of Bulgarian energy.

However, in the report for the first quarter, NEK cites the lack of precipitation as the reason for the decline in production. Statistics show that 40% less precipitation has been recorded in Bulgaria since January.

As one of the reasons for lower production, NEK also states the accumulation of water for the upcoming summer period.

Source: capital.bg

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania to permanently close Isalnita coal-fired power plant in January 2026

Romania’s Ministry of Energy has announced that the coal-fired Isalnita thermal power plant in Dolj county will be permanently shut down on 1 January 2026. The plant is part of the Energy Complex (EC) Oltenia. Energy Minister Bogdan Ivan made...

Romania: GE Vernova secures order to supply 252 MW Ialomita wind project

GE Vernova has signed an agreement with Greenvolt International Power to supply wind turbines for the 252 MW Ialomita wind farm in southeastern Romania. The order, confirmed in the third quarter of 2025, includes the delivery, installation, and commissioning of...

Montenegro launches geological surveys for strategic HPP Krusevo

Geological surveys for the Krusevo hydropower plant have started, marking the first concrete step in one of Montenegro’s key energy projects. The work follows a contract signed on 29 November 2024 between EPCG and the Jaroslav Cerni Institute for...
Supported byVirtu Energy
error: Content is protected !!