Romania: GE Vernova secures...

GE Vernova has signed an agreement with Greenvolt International Power to supply wind...

Montenegro launches geological surveys...

Geological surveys for the Krusevo hydropower plant have started, marking the first concrete...

Montenegro: EPCG and France’s...

Montenegro’s state-owned power utility EPCG has signed a cooperation agreement with French renewable...

Croatia enters heating season...

Croatia is entering the new heating season with stable gas supplies, high storage...
Supported byClarion Energy
HomeSEE Energy NewsCroatia, A total...

Croatia, A total volume of 386,052.3 MWh of electricity was traded on the in May

A total volume of 386,052.3 MWh of electricity was traded on the Croatian energy exchange CROPEX in May 2022, which is 31.4 % less than in April, of which 344,993.2 MWh on the day-ahead market and 41,059.1 MWh on the intraday market. Traded volume in May 2022 was 18.4 % lower compared to the same month last year.

Average daily base price on day-ahead market in May amounted to 202.03 euros/MWh, which is 5 % higher than in the previous month, while average euro-peak price reached 199.32 euros/ MWh, 4.1 % higher compared to the previous month. The average price on the intraday market was 198.94 euros/MWh, 9.1 % higher compared to April.

There are 26 participants on CROPEX day-ahead market (one less than in the previous month), eighteen of which have been active on the intraday market as well. Average daily traded volume on the day-ahead market in May amounted to 11,128.8 MWh.

CROPEX was launched on 11 March 2016 in cooperation with Nord Pool, Europe’s leading electricity exchange, and is co-owned by the Croatian electricity transmission system operator (HOPS) and the Croatian electricity market operator (HROTE). Intraday market was launched in April 2017. On 19 June 2018, after joint project of Croatian and Slovenian transmission system operators and power exchanges, CROPEX day ahead market was successfully coupled with MRC markets through Croatian – Slovenian border.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania to permanently close Isalnita coal-fired power plant in January 2026

Romania’s Ministry of Energy has announced that the coal-fired Isalnita thermal power plant in Dolj county will be permanently shut down on 1 January 2026. The plant is part of the Energy Complex (EC) Oltenia. Energy Minister Bogdan Ivan made...

Romania: GE Vernova secures order to supply 252 MW Ialomita wind project

GE Vernova has signed an agreement with Greenvolt International Power to supply wind turbines for the 252 MW Ialomita wind farm in southeastern Romania. The order, confirmed in the third quarter of 2025, includes the delivery, installation, and commissioning of...

Montenegro launches geological surveys for strategic HPP Krusevo

Geological surveys for the Krusevo hydropower plant have started, marking the first concrete step in one of Montenegro’s key energy projects. The work follows a contract signed on 29 November 2024 between EPCG and the Jaroslav Cerni Institute for...
Supported byVirtu Energy
error: Content is protected !!