Italy’s LNG strategy and...

Italy’s decision to consolidate control over key LNG infrastructure, including the Livorno terminal,...

Methane regulation, U.S. LNG,...

The emerging dispute between the United States and the European Union over methane-emissions...

Record European gas trading...

European gas trading has entered a new phase of financialisation and liquidity, with...

Trading Southeast Europe’s power...

Electricity trading in Southeast Europe (SEE) is no longer about forecasting average prices....
Supported byClarion Energy
HomeNews Serbia EnergySerbia, Biomass-fired heating...

Serbia, Biomass-fired heating plants in Priboj and in Mali Zvornik, have been officially commissioned

Two biomass-fired heating plants, in Priboj and in Mali Zvornik, have been officially commissioned.

Serbian Minister of Mining and Energy Zorana Mihajlovic said that the two town had problems with air quality for years and that the new plants will reduce CO2 and SO2 emission by 90 %. She reminded that 10 % heating plants in Serbia still use coal and another 10 % use heating oil, adding that it is imperative to transition these to renewable energy as well.

Minister Mihajlovic said that another two towns in Serbia – Majdanpek and Novi Pazar will get similar biomass-fired heating plants in 2022.

In June 2017, former Minister of Energy and Mining Aleksandar Antic has signed a loan and donation agreement with the representatives of German KfW Bank and Swiss Government that will enable ten heating plants in Serbia to switch from using fossil fuel to renewable energy sources, namely biomass. The first stage will include heating plants in the municipalities of Mali Zvornik, Nova Varos, Novi Pazar, Prijepolje, Bajina Basta, Valjevo, Priboj, Kladovo and Majdanpek, while the municipality of Becej has already launched two projects – one to convert a part of its heating plant to biomass and the other aimed at using geothermal energy.

Total worth of the project is 27 million euros, which also includes a 2 million euros grant from KfW Bank and 5 million euros grant from Swiss Government. The agreements on financing the transition of district heating companies from fossil fuel to biomass are part of the project Stimulating Renewable Energy – the Development of the Biomass Market in Serbia (DKTI) which was launched in Serbia back in 2012 with a feasibility study for Subotica district heating company. The signing of the agreement marked the start of first stage of that project, with total value of 108 million euros.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Region: Serbia–North Macedonia gas pipeline project set for completion by 2027

Plans for a new gas pipeline connecting Serbia and North Macedonia are moving forward with a defined timeline, as permitting is expected to conclude by mid-2026, followed immediately by construction. The update came after talks between Serbian Minister of...

Industry, electricity and the carbon clock: Serbia’s race to secure green power before CBAM reshapes the market

Europe’s Carbon Border Adjustment Mechanism (CBAM) has introduced a new dimension of industrial competitiveness: the carbon clock. Every year that passes without decarbonisation increases the cost burden for exporters selling into the European Union. For Serbia, whose manufacturing base...

Serbia 2030: A manufacturing hub powered by wind, solar and engineering talent — or an energy-expensive periphery?

By 2030, Serbia will be defined by the decisions it makes today about electricity, industrial policy and renewable energy. Two futures exist in parallel. In the first, Serbia becomes the leading nearshore manufacturing hub for Central and Western Europe,...
Supported byVirtu Energy
error: Content is protected !!