2030–2035 scenario annex: Gas...

Scenario one: High volatility, tight LNG markets In a scenario characterised by global LNG...

What the European gas...

The European natural gas market has moved decisively away from its pre-2020 equilibrium....

Policy without borders: How...

Electricity market coupling is often discussed in technical or commercial terms, but its...

Fragmented convergence: Why Southeast...

For much of the past decade, the dominant assumption shaping policy and market...
Supported byClarion Energy
HomeNews Serbia EnergySerbia, Revitalization of...

Serbia, Revitalization of hydropower plant Zvornik was completed on time

The revitalization of hydropower plant Zvornik was completed on time, efficiently and accurately, said Minister of Energy and Mining Zorana Mihajlovic during her visit to the first hydropower plant built on the Drina river. She visited the plant with Klaus Mueller, Regional Director of the German Development Bank (KfW) for southeastern Europe.

Minister Mihajlovic said that state-owned power utility EPS is facing great challenges in the near future, but she assured that the company can cope with these challenges and can invest a lot and influence Serbia to achieve dominant green energy production in the coming decades.

Director of Capital Investment Sector at EPS Vladimir Markovic said that EPS had invested approximately 65 million euros from a KfW Bank loan in the revitalization of all four units of HPP Zvornik, adding that, in four years, strength, efficiency and reliability of the plant has been significantly increased due to the revitalization project.

Installed capacity of HPP Zvornik has been increased by an additional 30 %, from 92 MW to 122 MW. The revitalized generators were put into operation gradually from December 2016 to January 2020 and have so far produced more than 1.75 million MWh of electricity. New, more efficient generators have enabled HPP Zvornik, which was built in 1955, to set more monthly records in green energy production and break even more daily records. Thus, on 2 May, the latest daily record in the production of 2,855 MWh of electricity was set.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

2030–2035 scenario annex: Gas prices, CBAM and export margins

Scenario one: High volatility, tight LNG markets In a scenario characterised by global LNG tightness, regulatory uncertainty, and persistent geopolitical risk, European gas prices remain volatile with frequent spikes. Average prices may moderate, but extreme events become more common. Under this...

Gas–power flexibility models for Serbian industries

Flexibility as a cost-control mechanism Flexibility has become the primary tool for managing gas-driven volatility. In the Serbian context, flexibility does not mean eliminating gas use but managing when and how gas and electricity are consumed. At the system level, flexibility...

Gas vs electricity procurement: Strategic choices fo Serbian exporters

Serbian exporters increasingly face a strategic choice: treat gas and electricity as separate procurement streams or integrate them into a unified energy risk strategy. The latter approach is rapidly becoming essential. Gas procurement indexed fully to TTF offers flexibility but...
Supported byVirtu Energy
error: Content is protected !!