Slovenia: Climate negotiator challenges...

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition...

Romania: Constanța to get...

A new high-efficiency cogeneration plant is under development on the site of the...

Romania: Ministry of Energy...

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering...

Bosnia and Herzegovina: EPBiH...

State-owned power utility EPBiH has opened a tender for the preparation of the...
Supported byClarion Energy
HomeSEE Energy NewsInterim Coupling project:...

Interim Coupling project: Go-live confirmed for 17 June

The go-live of the Interim Coupling project is confirmed for 17 June 2021 (first delivery day 18 June 2021), following the successful completion of technical readiness.

The Interim Coupling project aims to connect the 4M MC (Czech-Slovak-Hungarian-Romanian market coupling) with the Multi-Regional Coupling (MRC) by introducing Net Transmission Capacity (NTC) based implicit capacity allocation on six new borders: PL-DE, PL-CZ, PL-SK, CZ-DE, CZ-AT, HU-AT. The project represents an important step towards the extension of the European Single Day-Ahead Coupling foreseen by Regulation 2015/1222 (guideline on Capacity Allocation and Congestion Management/CACM).

The DE-AT-PL-4M MC Project, also referred to as Interim Coupling aims to connect the borders of 4M MC with the Multi-Regional Coupling (MRC) by introducing Net Transmission Capacity based (NTC-based) implicit capacity allocation on six borders (PL-DE, PL-CZ, PLSK, CZ-DE, CZ-AT, HU-AT). This will mark the start of the so-called enduring phase of SDAC, during which there will be one European Single Day-Ahead Coupling only, where MRC and 4M MC are coupled.

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Slovenia: Climate negotiator challenges legality of Krsko nuclear power plant expansion plan

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition with the Constitutional Court challenging the legality of the national spatial plan procedure for the proposed second unit at the Krsko nuclear power plant. Representing public...

Romania: Constanța to get modern gas-hydrogen cogeneration plant, replacing 1970s infrastructure

A new high-efficiency cogeneration plant is under development on the site of the former CET Palas facility in Constanța, replacing infrastructure dating back to the 1970s. Valued at 120 million euros and largely financed through the National Recovery and...

Romania: Ministry of Energy unveils five-point plan to cut electricity prices by 20–25%

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering electricity prices, with measures expected to take effect next week. Energy Minister Bogdan Ivan stated that the initiative, developed in consultation with producers, distributors, suppliers, and...
Supported byVirtu Energy
error: Content is protected !!