Slovenia: NPP Krsko exceeds...

In September 2025, the Krsko nuclear power plant, jointly owned by Slovenia and...

Romania: Electrica completes 27...

Romanian electricity distributor and supplier Electrica has completed the construction of the Satu...

Romania: NEPI Rockcastle launches...

NEPI Rockcastle, the largest owner and operator of shopping centers in Central and...

Bulgaria: Bulgargaz secures LNG...

Bulgaria’s state-owned natural gas supplier Bulgargaz has completed a tender to meet part...
Supported byClarion Energy
HomeSEE Energy NewsBosnia and Herzegovina:...

Bosnia and Herzegovina: January BiH gross electricity production

According to Agency for Statistics of Bosnia and Herzegovina (BiH), gross electricity production in the country amounted to 2,043 GWh in January 2021, compared to 1,818 GWh in the same month last year. In total gross electricity production hydropower plants participated with the share of 43.1 %, thermal power plants with 55.5 % and solar and wind power plants with 1.4 %. Net production of hydropower plants amounted to 872 GWh in January 2021, which is 51.4 % more than in the same month in 2020. Thermal production amounted to 1,027 GWh, which is 6.6 % less than last January. Electricity production from renewable sources (wind and solar) reached 28 GWh. Electricity imports rose by 3 % to 204 GWh in January from last year’s 198 GWh, while exports increased by 37 % to 1,045 GWh (763 GWh in January 2020). Production of lignite in BiH amounted to 514,000 tons in January 2021, which is 15.6 % less compared to the same month last year, while the production of brown coal decreased by 21 % and amounted to 451,000 tons. Natural gas imports in January 2021 amounted to 36.654 million cubic meters, which is 1.3 % less than a year before (37.121 million cubic meters).

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Slovenia: NPP Krsko exceeds planned output in September 2025, begins scheduled overhaul

In September 2025, the Krsko nuclear power plant, jointly owned by Slovenia and Croatia, generated 449,426 MWh of net electricity, slightly exceeding the planned output of 446,000 MWh by 0.77%. On 28 September, NPP Krsko completed its 34th fuel cycle...

Romania: Electrica completes 27 MW Satu Mare 2 solar power plant to boost renewable energy portfolio

Romanian electricity distributor and supplier Electrica has completed the construction of the Satu Mare 2 solar power plant, further advancing its strategy to expand renewable energy production and diversify its portfolio. Located near Botiz in Satu Mare County, the new...

Romania: NEPI Rockcastle launches first solar power plant as part of €110 million green energy program

NEPI Rockcastle, the largest owner and operator of shopping centers in Central and Eastern Europe, has completed its first solar power plant in Chisineu-Cris, Arad County. The project is part of the company’s broader 110 million-euro renewable energy program...
Supported byVirtu Energy
error: Content is protected !!