Financing wind in Montenegro,...

The landscape of renewable finance in Southeast Europe has undergone a profound transformation....

How Southeast Europe’s grid...

Wind development in Southeast Europe is accelerating at a pace unimaginable only a...

Serbia–Romania–Croatia: The new triangular...

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside...

The bankability gap in...

The transformation of Southeast Europe into a credible wind-investment region has been rapid,...
Supported byClarion Energy
HomeSEE Energy NewsHungary: Last coal-fired-TPP...

Hungary: Last coal-fired-TPP Matra should be closed by 2025

The Hungarian Secretary of State for EU Affairs Attila Steiner announced that the last coal-fired thermal power plant in Hungary – 844 MW Matra, will be closed in 2025 instead of 2030. Confirming the closure of the power plant is a crucial step in the planning of a just transition, Steiner said that Hungary’s plan is to achieve 90 % carbon-neutral electricity production by 2030. The country intends to achieve this by maintaining existing nuclear electricity generation capacity and increasing solar power capacity to 6 GW – three times the country’s existing nuclear capacity. Steiner said that Hungary will benefit from EU funds to retrain coal workers affected by the closure, as the 500 MW gas-fired power plant and a large 200 MW solar power plant will be built on the site of TPP Matra.

In addition to Hungary, the following six European countries are expected to cease the use of coal by 2025: France (2022), Portugal (2022), Slovakia (2023), the United Kingdom (2024), Ireland (2025) and Italy (2025).

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Financing wind in Montenegro, Serbia, Croatia and Romania — why international lenders are returning to Southeast Europe

The landscape of renewable finance in Southeast Europe has undergone a profound transformation. A decade ago, lenders viewed the region with a degree of caution, shaped by fluctuating regulatory frameworks, limited track records, and the perceived fragility of local...

How Southeast Europe’s grid bottlenecks will reshape project valuation, offtake strategy and EPC designs by 2030

Wind development in Southeast Europe is accelerating at a pace unimaginable only a decade ago, yet the region’s grid infrastructure is straining under the weight of its own renewable ambition. Serbia is preparing for multi-gigawatt expansion, Romania is restarting...

Serbia–Romania–Croatia: The new triangular wind corridor — is Southeast Europe becoming Europe’s next Iberia?

For years, the Iberian Peninsula defined what a wind powerhouse looked like inside Europe: strong resource, open land, grid-ready corridors, competitive auctions, and the steady inflow of international capital. Investors seeking scale, yield, and policy clarity migrated naturally towards...
Supported byVirtu Energy
error: Content is protected !!