Romania: Parapet and Alerion...

Romanian renewable energy engineering company Parapet has signed seven new contracts with Italian...

North Macedonia: Day-ahead power...

In October 2025, electricity trading on North Macedonia’s day-ahead market reached 146,498 MWh,...

Greece: ExxonMobil, Energean and...

A new stage in Greece’s offshore energy exploration has begun as ExxonMobil, Energean,...

Croatia: CROPEX electricity trading...

In October 2025, a total of 1,449,339.1 MWh of electricity was traded on...
Supported byClarion Energy
HomeSEE Energy NewsNorth Macedonia: Production...

North Macedonia: Production of electricity in December

In December 2020 a total electricity consumption in North Macedonia amounted to 859,827 MWh, natural gas consumption amounted to 46.3 million cubic meters, coal consumption reached 468,414 tons, while the consumption of petroleum products stood at 92,211 tons. According to the data from State Statistical Office, 58 % of the consumed electricity in December was covered by domestic production, while 97.2 % of the total coal consumption was used for electricity production. Total net production of electricity in Macedonia in December 2020 stood at 465,817 MWh, which is by 5.5 % lower compared to the same month last year. 225,779 MWh or 48.7 % was produced at thermal power plants (- 19.7 % compared to December 2019), 68,265 MWh or 14.7 % was produced at hydropower plants (- 41.8 %), 159,415 MWh or 34.2 % in CHP plants and 6,720 MWh or 1.44 % was produced by Bogdanci wind farm. Total net production of electricity in Macedonia in 2020 stood at 5,032,758 MWh, which is 8.5 % lower compared to the previous year. 2,450,935 MWh or 48.7 % was produced at thermal power plants (- 24.3 % compared to 2019), 1,271,903 MWh or 25.3 % was produced at hydropowerplants (+ 10.1 %), 1,112,203 MWh or 22.1 % in CHP plants (+ 19.8 %) and 116,884 MWh or 2.32 % was produced by Bogdanci wind farm (+ 14.8 %).

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania: Parapet and Alerion sign seven new solar projects totaling 80 MW

Romanian renewable energy engineering company Parapet has signed seven new contracts with Italian renewables developer Alerion, expanding their long-term partnership with projects totaling nearly 80.8 MW across Romania and Italy. Construction will take place in Romania’s Teleorman and Călărași counties...

North Macedonia: Day-ahead power trading jumps 82% year-on-year in October 2025

In October 2025, electricity trading on North Macedonia’s day-ahead market reached 146,498 MWh, marking an 81.7% increase compared to the same month last year and a 43% rise from September. According to the market operator MEMO, the average market-clearing price...

Greece: ExxonMobil, Energean and Helleniq launch new offshore exploration phase in Ionian Sea

A new stage in Greece’s offshore energy exploration has begun as ExxonMobil, Energean, and Helleniq Energy signed a farm-in agreement granting them joint ownership of 60% in Block 2 of the Ionian Sea, located northwest of Corfu. The signing...
Supported byVirtu Energy
error: Content is protected !!