Slovenia: NPP Krsko exceeds...

In September 2025, the Krsko nuclear power plant, jointly owned by Slovenia and...

Romania: Electrica completes 27...

Romanian electricity distributor and supplier Electrica has completed the construction of the Satu...

Romania: NEPI Rockcastle launches...

NEPI Rockcastle, the largest owner and operator of shopping centers in Central and...

Bulgaria: Bulgargaz secures LNG...

Bulgaria’s state-owned natural gas supplier Bulgargaz has completed a tender to meet part...
Supported byClarion Energy
HomeSEE Energy NewsBulgaria: Since state...

Bulgaria: Since state of emergency AES produced over 300,000 MWh of electricity

Since the state of emergency was declared in Bulgaria its coal-fired thermal power plant AES Galabovo and its wind farm Saint Nikola produced a total of 302,388 MWh of electricity in the period between 13 March and 13 April, as AES Bulgaria stated.

The statement from the company said that the thermal power plant produced 262,054 MWh of electricity in said period, while Saint Nikola wind farm generated additional 40,334 MWh. The produced electricity was enough to cover the needs of some 1.11 million households in the country.

TPP Galabovo produced a total of 3.14 million MWh of electricity in 2019, which is 5.5 % more than in the previous year. The plant itself covered about 8.3 % of Bulgaria’s electricity consumption in 2019 and consumed about 5.37 million tons of coal, 3.3 % more than in 2018. At the same time, Saint Nikola wind farm the largest wind farm in the country, produced a total of 291 GWh of electricity, compared to 318 GWh in 2018. The 156 MW wind park has saved Bulgaria 323,277 tons of carbon dioxide emissions in 2019. Saint Nikola wind park is located near the town of Kavarna on the Black Sea coast. It was built in 2009 and put into operation a year later. It has 52 wind turbines with power output of 3 MW each. The total investment in the project was 270 million euros, of which 198 million euros was provided by a bank consortium including the European Bank for Reconstruction and Development (EBRD), the International Financial Corporation (IFC) and UniCredit Bank. In 1999, US AES Corporation purchased the majority stake in Bulgaria’s Maritsa East 1 power plant, subsequently renamed AES Galabovo in 2009. AES completed the full acquisition of the 600 MW thermal power plant from Ireland’s Consolidated Continental Commerce Limited in 2005.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

From Čačak to Europe: Nearshoring shared business services with regional talent and real connectivity

Čačak sits in the heart of Serbia with an asset mix that plays perfectly to near-sourcing: a deep regional talent catchment, motorways that cut transit times to major hubs, and operating costs that let you scale shared business services...

The new currency of trust: Where technical risk meets financial consequence

In modern infrastructure, oversight isn’t a paperwork ritual—it’s a translation exercise. Design choices, test results, and schedule slips must be converted into hard numbers a credit committee can act on. That alignment of technical risk with financial consequence has...

When ESG gaps halt financing: The Owner’s Engineer’s role in industrial projects

In industrial construction today, an ESG non-conformity can hold a loan tranche as effectively as a failed transformer test. Lenders and investors now expect the Owner’s Engineer (OE) to treat environmental, social, and governance risks with the same rigor...
Supported byVirtu Energy
error: Content is protected !!