Romania: OPCOM reports decrease...

In April 2025, the average price of electricity on the day-ahead market of...

Croatia: CROPEX reports decrease...

In April 2025, a total of 982,941.6 MWh of electricity was traded on...

Low hydropower reserves and...

Southeastern Europe is heading into the summer season with concerningly low water levels...

Slovenia: Households paid below-average...

Slovenian households benefited from significantly lower electricity prices last year compared to the...
Supported byClarion Energy
HomeUncategorizedCorporate Enterprise Power...

Corporate Enterprise Power Plants Nikola Tesla TENT in next five years will take its place where belongs in the region: it will be a leader in electricity production in South East Europe, says General Manager Mr.Petar Knezevic

 

Corporate Enterprise Power Plants Nikola Tesla TENT in next five years will take its place where belongs in the region: it will be a leader in electricity production in South East Europe, says General Manager Mr.Petak Knezevic.  

With new energy law and its importance on the market, new influence for producers of electricity will be introduced.  

– The time with bigger awareness that electricity should not be social category is approaching, it has to be considered as product that demands investments and knowledge. This big truth we have to promote as much as possible, stated Mr.Knezevic

Serbia-Energy: In September we completed two big overhauls of units TENT B2 and A4, other works are also being in completion. How do you evaluate this year overhaul season?  

-Despite the fact that this year overhaul season was smaller when it comes to scope of works, everything was completed with high level of quality. We had major overhauls on units B2 and A4. The B2 overhaul lasted 120 days, the biggest job was the reconstruction of the electrostatic precipitator. Half of needed funds were provided from donations, second half was financed from our own sources. Second major project on this unit was the replacement of part of pipe system, and this represents the start of complete modernization of units B1 and B2. As for A4 unit, the reconstruction of the mills will be completed for 60 days, instead of planned 75 days. On A4 mills we increased the quality and capacity of milling, which is the precondition for process optimization of burning and eliminating of NOx. In September we are completing the repairs on turbine of third unit on power plant Kolubara with outpower of 60mw, and we expect that very soon the overhaul on TENT A4 unit will be completed also, as well as the overhaul of the single unit of 125 MW on Morava power plant. On other units we completed standard overhauls. All facilities will be completely prepared for coming winter season.

Complete Interview with Mr.Knezevic in Executive Interview Section LINK

 

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Albania: SOCAR to begin supplying natural gas to Korca

The State Oil Company of Azerbaijan (SOCAR) is set to launch natural gas supply operations in the Albanian city of Korca, marking the first phase of a larger initiative aimed at establishing a comprehensive gas distribution network throughout the...

FBiH: Net electricity production reached 473 GWh in June

Net electricity generation in the Federation of BiH fell to 473 GWh in June 2024 from 582 GWh in the same month last year, according to the data published by the statistical office. In the same period, electricity imports increased to 126 GWh...

Croatia: JANAF buys 5.2 MW solar park

Croatian oil pipeline operator JANAF has indirectly acquired the Bulinac solar photovoltaic power plant with an installed capacity of 5.18 MW as part of its diversification strategy, the company said in a filing to the Zagreb stock exchange.The acquisition of this...
Supported byVirtu Energy
error: Content is protected !!